Vår webbplats fungerar inte med din nuvarande webbläsare Internet Explorer. Uppgradera till en nyare webbläsare för att använda vår webbplats. Läs mer på sidan Rekommenderade webbläsare.

Reload page
The page needs to be reloaded because you were inactive for a long time.
Go to the page menu Go to the page content

OVK

Reviewed:

OVK – Which buildings and when?

Below is a table showing the inspection intervals and authorisation levels required for different categories of buildings.

FT-ventilation = mechanical ventilation in which both the extract and supply air flows are controlled by fan.

F-ventilation = mechanical ventilation where the extract air flow is controlled by fan.

S-ventilation = natural ventilation.

FTX-ventilation and FX-ventilation = FT-ventilation and F-ventilation with heat recovery.

N = normal authorisation level.

K = complicated authorisation level.

Buildings Inspection interval (periodic inspection) Performance controller's lowest authorisation level
Pre-schools, schools, health care premises and the like with S, F, FX-ventilation 3 years N
Pre-schools, schools, health care premises and the like with FT, FTX-ventilation  3 years K
Multi-dwelling blocks, office buildings and the like with FT, FTX-ventilation 3 years K
Multi-dwelling blocks, office buildings and the like with F, FX, S-ventilation 6 years N
Single and two-dwelling houses with FX, FT, FTX-ventilation Control only for new construction and new installation N
Was the information helpful? Yes No
Back to top